Publication Date
Jul 2008
Publication Type
Dubos, G.F.; Saleh, J.H.; and Braun, R.D.; "Technology Readiness Level, Schedule Risk, and Slippage in Spacecraft Design" Journal of Spacecraft and Rockets, Vol. 45, No. 4, pp. 836-842, July-August, 2008.