Publication Date
Sep 2007
Publication Type
Dubos, G.; Saleh, J.; and Braun, R.; "Technology Readiness Level, Schedule Risk and Slippage in Spacecraft Design: Date Analysis and Modeling," AIAA 2007-6020, AIAA Space 2007 Conference and Exposition, Long Beach, CA, September 2007.